3. Air Filter and Silencer
Installation Gas Turbine
Client: Distric Cooling System and Power Plant Co.,Ltd.
Gas Turbine Replacement Package II (DPP2) Project
Installation Filter House of Gas Turbine
Client: Chaimitr Engineering International Co.,Ltd.
Filter House of Gas Turbine Replacement Project
Installation Filter House
Client: Donaldson Filtration (Asia Pacific) Pte,.Ltd./IHI
Filter House Rojana Power Plant 122 M.W Project
Fabrication Air Filter & Silencer
Client: Distric Cooling System and Power Plant Co.,Ltd.
Air Filter LM6000 & Silencer for TANIR BAVI Project
Pre-Assemble Walkway / Filter / Transition Kit
Client: Donaldson Filtration (Asia Pacific) Pte,.Ltd./IHI
Donaldson Air Filter OMAN Project
Fabrication Air Filter
Client: Donaldson Filtration (Asia Pacific) Pte,.Ltd./IHI
Donaldson Air Filter OMAN Project
Pre-Assemble Walkway / Filter Module
Client: Donaldson Filtration (Asia Pacific) Pte,.Ltd./IHI
Donaldson PTT Thailand Project
Fabrication Walkway Assembly 16H
Client: Donaldson Filtration (Asia Pacific) Pte,.Ltd./IHI
Fabrication Walkway Assembly 16H
Fabrication Walkway Assembly 13H
Client: Donaldson Filtration (Asia Pacific) Pte,.Ltd./IHI
Donaldson PTT Thailand Roll Royce Project
Fabrication Transition Kit
Client: Donaldson Filtration (Asia Pacific) Pte,.Ltd./IHI
Donaldson PTT Thailand Project
Fabrication Silencer & Elbow
Client: Donaldson Filtration (Asia Pacific) Pte,.Ltd./IHI
SAKHALIN (4 Unit) Project
Fabrication Silencer & Bleed Pipe
Client: Donaldson Filtration (Asia Pacific) Pte,.Ltd./IHI
SAKHALIN (4 Unit) Project
Fabrication Transition
Client: Donaldson Filtration (Asia Pacific) Pte,.Ltd./IHI
SAKHALIN (4 Unit) Project
Fabrication Filter
Client: Donaldson Filtration (Asia Pacific) Pte,.Ltd./IHI
SAKHALIN (4 Unit) Project